Tianjin, Beijing-Tianjin inter-city road in succession planning and construction inside and outside the central business district to connect faster



Business Center business district and outside the building to speed up traffic engineering, the main business district has been forming network, to connect with the central business district of Tianjin City Road has started construction on high-speed rail transfer center Jiabao has already begun detailed planning and design, business center business district Will have extensive internal and external transport network.
Tianjin from the Outer Ring Road overpass Jingu, will be along the two-town district Tsunan, Daxinzhuang town, the town of Xian Shuigu, Shuangqiao town, the town of Gegu, Tanggu district of the new towns and commercial centers in the central business district and Road-connected, close to a total length of 37 km for the 8-lane two-way, design speed of 80 km, on both sides of the road will be built with ecological protection, planting various kinds of green plants and drainage facilities will be combined with the landscape. Tianjin Road is the only one located in the south bank of Haihe River, the commercial center and business district in the urban areas directly linked to that of the fast-track, to avoid vehicles entering the road from the north shore of the business district, encountered Haimen Bridge to Bridge caused delays.
In order to the Central Business District's more convenient traffic, the Beijing-Tianjin inter-city EMU will be introduced at Jiabao. At present, the business district Jiabao on the introduction of high-speed rail transfer center project has entered a new line of planning and design stage. In addition to the high-speed railway stations at Jiabao, the modern tram rail line II Jiabao will also be included in the scope of planning. To be opened across the board, from Beijingnanzhan Jiabao at the financial center, about 162 kilometers distance, will take approximately 59 minutes, the Central Business District will be faster to the outside world.
In addition, the region's business network has been building the basic shape, the road width of 60 meters Yingbin Avenue have been opened to traffic conditions, Henan Road, del Road, Tuo field, man shun, Anyang Road, Desheng Road and other main roads posed by Jingu network will be connected to the line and Haihe River. Business in the region have been scores of roads open to traffic conditions, road on both sides of the green also have been completed, the transport network both within and outside the business district is rapidly emerging.
2008-08-11